A completed two-story barndominium with second-story windows and a small covered balcony above the entry porch, in the desert.

2-Story Barndominium in Nevada

A second storey puts more house on a smaller slab, which matters where a septic field, a well and setbacks eat most of the lot. A second storey also changes the structure. Every local code in Nevada carries the IBC seismic provisions, and the northern jurisdictions add a special wind region. In summer the upper floor collects the heat the whole house gains.

What actually changes with this feature

The look is the easy part. These are the decisions that follow from it.

Wind on a taller wall

The northern amendments define a special wind region for Carson City, Reno, Sparks and Douglas, Lyon, Storey and Washoe counties with a minimum ultimate design wind speed of 120 mph for Risk Category II and the 2024 IRC, and they prohibit air-density reductions to wind pressure. Clark County's amended table uses 98 mph with exposure category C unless the applicant justifies otherwise. A two-storey gable wall presents twice the sail area of a single storey, so the difference between those two figures shows up in girt spacing and bracing.

How tall zoning lets you go

Clark County's Title 30 sets a 35-foot height for the primary structure in the RS80, RS40 and RS20 districts, well above a typical two-storey barndominium. In the RS10 and denser districts, a detached accessory building beside it is held to 14 feet. Incorporated cities and HOAs set their own limits, so a two-storey plan should be checked against the parcel's zone before the roof pitch is picked.

Heat collects upstairs

Warm air rises, and in the southern valleys an upper floor under a metal roof can run noticeably hotter than the ground floor unless the roof assembly is well insulated and ventilated. Separate cooling zones for each floor, a light-coloured roof, and bedrooms placed on the north side of the upper floor all help. In the north, the same stratification is useful in winter.

Stairs take floor area on both levels

A straight stair takes roughly the same footprint on both floors, and a barndominium's open span makes it tempting to put it anywhere. Centring it keeps structural loads on interior posts or a steel frame line. It also leaves both gable walls free for the large windows the style is known for.

A completed two-story barndominium with second-story windows and a small covered balcony above the entry porch, in the desert.
Seismic country

Height is where Nevada's seismic categories start to matter

NRS 278.580(6) requires every local building code adopted in Nevada to include the IBC's seismic provisions and standards for investigating seismic hazards, but the design category is set locally. The 2024 Northern Nevada Code Amendments list seismic design category D2 for Carson City, Reno, Sparks, Fernley, Washoe County and Douglas County, D1 for Fallon, Churchill County, Lyon County and Storey County, and D0 for the City of Elko. Clark County's amended IRC table lists D0 for every elevation band up to 3,900 feet. A second storey on a steel or post-frame shell adds mass high in the building and longer load paths to the foundation, and the bracing, hold-downs and connections that satisfy D0 in Henderson are not the same set that satisfies D2 in south Reno.

Common ways to build this

Common ways to lay this out. Yours does not have to match one exactly — this is a starting point for the conversation, not a catalog.

Primary suite down, bedrooms up

1,400 sq ft main / 1,000 sq ft upper

Main living and the primary bedroom on the ground floor for single-level living later, with two or three bedrooms and a bath above. This is the most common two-storey arrangement.

Shop below, living above

1,500 sq ft shop / 1,500 sq ft living above

The living floor sits over a full-footprint shop. Fire separation, sound and stair access all need careful detailing, and in a D2 seismic area the shop's wide door openings must still carry the upper floor's lateral loads.

Compact footprint on a small lot

1,100 sq ft main / 1,100 sq ft upper

A near-square two-storey that leaves most of a one-acre lot free for the septic field, the well separation and a turnaround. It suits Washoe County parcels where the health authority's one-acre minimum is already tight.

2-Story Barndominium: common questions

6 questions worth settling about this layout before anything is drawn. If yours is not on the list, ask it in the survey.

Is a 2-story barndominium safe in Nevada earthquakes?
It is built to the seismic design category the local code assigns, which in Nevada ranges from D0 in Clark County and the City of Elko to D2 in Reno, Sparks, Carson City, Washoe County and Douglas County. Every local code must include the IBC seismic provisions under NRS 278.580(6). A two-storey plan in a D2 area needs more lateral bracing and stronger connections than the same plan in D0.
Does a second floor need stamped drawings?
That depends on the building department and the structural system. Steel barndominium shells are commonly designed by the manufacturer's engineer, and where the department requires it, drawings are stamped by a Nevada-licensed professional engineer or architect. Ask the permitting office early what it requires for your structural system.
How do I keep the upstairs cool in Las Vegas or Pahrump?
Insulate and ventilate the roof well, choose a light roof colour, zone the cooling so the upper floor has its own control, and shade the upper-floor windows on the west. The Southern Nevada amendments to the energy code apply in Clark County. Elsewhere, the 2024 IECC is the minimum under NRS 701.220.
Is a 2-story barndo cheaper than a single story of the same size?
A smaller foundation and roof can offset the cost of the floor system and stairs, but the balance depends on the site. This page does not quote prices. The cost guide covers third-party figures.
How does wind affect a two-storey barndominium in Reno or Carson City?
The northern amendments set a 120 mph ultimate design wind speed for Risk Category II buildings there, and prohibit air-density corrections to wind pressure. A taller wall catches more of that load, so the frame, girts and wall panels are sized for it.
Can I add a second floor to a barndominium later?
Only if the original frame and foundation were designed for it. Retrofitting a second floor into a clear-span shell usually means new columns and footings. If a future upper floor is likely, build it into the original structural design.

Have land in mind, or still looking? Telling us about the parcel is where a build actually starts.

Start with your land

Tell us what you want to build and where. The questions on this page are answered by your county or city building department, your health district and, where the department requires stamped drawings, a Nevada-licensed engineer or architect. Our survey is where we start that conversation, and it costs nothing.